during design
At Uzun & Case we believe that design is integration, and
that the success of our solutions should be judged by how well
the structural needs of the project are integrated with its
architectural, construction and budgetary requirements. |
|
| In order to achieve this, our principals
personally guide the conceptual design of a project, putting
forth and testing multiple proposals in order to ensure that
the most appropriate structural solution is arrived at. Periodic
reviews by principals as the design develops makes certain that
the integrity of the project is maintained. |
|
during construction document production
In the construction documents phase of the project, as in all
others, we are guided by the principle that our work is teamwork.
We understand the critical need to work closely with other team
participants in order to produce designs which are reflective
of each party’s concerns. |
|
| Therefore our project engineers are charged
with anticipating and resolving coordination issues as early
as possible in order to minimize problems which could affect
the project’s progress. |
|
| Appropriate staffing of our projects and
a thorough quality control program ensure high quality construction
documents. |
|
during construction
We see the construction phase of a project as an extension of
its design phase. Therefore it is our policy for the design
engineer to stay with a project through construction. This enables
us to better serve our clients by ensuring continuity of design
intent and responding quickly to construction issues. |
|
| Our numerous contractor references testify
to the quality of our construction phase services. We pride
ourselves in working together with contractors to ensure the
success of the project. This includes providing timely responses
to questions, quickly reviewing shop drawings, and responding
creatively to field problems. |